§ 136-33. Industrial discharge permit modification.  


Latest version.
  • The Director of Public Works may modify an industrial discharge permit for good cause, including, but not limited to, the following reasons:
    A. 
    To incorporate any new or revised federal, state or local pretreatment standards or requirements.
    B. 
    To address significant alterations or additions to the user's operation, processes or wastewater volume or character since the time of industrial discharge permit issuance.
    C. 
    A change in the Lebanon Treatment Works that requires either a temporary or permanent reduction or elimination of the authorized discharge.
    D. 
    Information indicating that the permitted discharge poses a threat to the city's Lebanon Treatment Works, city personnel or the water quality in the receiving waters.
    E. 
    Violation of any terms or conditions of the industrial discharge permit.
    F. 
    Misrepresentations or failure to fully disclose all relevant facts in the industrial discharge permit application or in any required reporting.
    G. 
    Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13.
    H. 
    To correct typographical or other errors in the industrial discharge permit.
    I. 
    To reflect a transfer of the facility ownership or operation to a new owner or operator.